{"id":214,"date":"2024-06-18T12:26:00","date_gmt":"2024-06-18T10:26:00","guid":{"rendered":"https:\/\/aprc.fr\/aprc-aprc-group-helps-la-scalandes-e-leclerc-optimize-its-logistics-strategy\/"},"modified":"2025-10-02T10:57:25","modified_gmt":"2025-10-02T08:57:25","slug":"la-scalandes-e-leclerc-optimize-its-logistics-strategy","status":"publish","type":"post","link":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/","title":{"rendered":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A major player in the development of E. Leclerc&#8217;s market share, La Scalandes is implementing its master plan in the South-West of France. Leclerc, the La Scalandes purchasing center in the South-West of France is implementing its master plan to adapt its logistics infrastructures to its growth. APRC supported the company in this process, delivering two logistics buildings in early 2024. <br><br>Although the operation was launched on the eve of the outbreak of war in Ukraine, the teams led by Claude Bouillard, Managing Director of La Scalandes, and Karim Abdellaoui, Chairman of APRC Group, demonstrated their adaptability and constructive intelligence to ensure that the initial CPI was a success for all parties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A few years ago, Scalandes drew up a master plan with two major objectives:<br>to increase the market share of the E. Leclerc&#8217;s market share, and more specifically that of its centers in the South-West region, and to reinternalize activities, notably logistics, which had previously been outsourced to specialized service providers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cFor us, this meant rethinking the dynamics of our three organizational pillars on which our growth is based: people, buildings and IT,\u201d explains Claude Bouillard, General Manager of La Scalandes. \u201cIt is in this context that, after equipping the Mont-de-Marsan site with a building dedicated to frozen products in 2021, we entrusted APRC with the construction of this new platform, which comprises two buildings: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>un entrep\u00f4t logistique et frigorifique d\u2019environ 10 100 m\u00b2 \u00e0 temp\u00e9rature contr\u00f4l\u00e9e (+ 2\u00b0C) \u00e9quip\u00e9 d\u2019un process de type trieur, avec pr\u00e8s de 1 100 m\u00b2 de locaux sociaux et de bureaux, 300 m\u00b2 de locaux techniques, 450 m\u00b2 de locaux de charge, une zone d\u2019extension possible de 6 000 m\u00b2 ;<br><\/li>\n\n\n\n<li>a 3,000 m\u00b2 \u201cReverseLog\u201d dry logistics warehouse, including offices and technical rooms, for pallet storage, with an outdoor area of 1,660 m\u00b2.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This ReverseLog building, positioned at the heart of a site that now comprises 6 buildings, is all the more strategic as it contributes to E. Leclerc&#8217;s ambition to optimize its carbon neutrality. Leclerc. \u201cFor us, the challenge is to ensure that our vehicles never return empty, by collecting all shopping center waste: pallets, packaging, plastics, cardboard and all other recyclable products,\u201d explains Claude Bouillard. \u201cIn the same virtuous perspective, these new infrastructures are 100% covered with photovoltaic panels for shared self-consumption with the existing buildings.  <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe call for tenders for these two new buildings was won by APRC, who proved to be the most convincing, even though it was one of their competitors who had built the building dedicated to frozen products,\u201d emphasizes Claude Bouillard. \u201cThis type of project, especially when faced with a context as particular as that generated by the war in Ukraine and its consequences on the cost of materials, is above all a story about people. Karim Abdellaoui&#8217;s commercial acumen in the pre-sales phase and his adaptability during the construction phase, when he worked with us to find solutions that would enable us to keep within the budget defined in the CPI, demonstrate all his qualities as a conductor. The success of our joint approach to optimizing the site, striking a balance between reducing costs and cutting back on services, by doing things differently and differently than planned to stay within the initial budget, depends on him. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">About La Scalandes E. Leclerc<br>La Scalandes E. Leclerc is one of the 16 purchasing groups of GALEC &#8211; Groupement d&#8217;Achats E. Leclerc.<br>In a few figures, SCALANDES E. Leclerc is :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>100,000 m\u00b2 of warehouse space<\/li>\n\n\n\n<li>50 million plots prepared per year<\/li>\n\n\n\n<li>800,000 pallets transported per year<\/li>\n\n\n\n<li>67 stores supplied<\/li>\n\n\n\n<li>67 stores supplied<\/li>\n\n\n\n<li>480 employees on average, projected to reach 550 by 2025<\/li>\n\n\n\n<li>930 million in sales by 2023.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A major player in the development of E. Leclerc&#8217;s market share, La Scalandes is implementing its master plan in the South-West of France. Leclerc, the La Scalandes purchasing center in the South-West of France is implementing its master plan to adapt its logistics infrastructures to its growth. APRC supported the company in this process, delivering [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2983,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13],"tags":[],"type-construction":[55,31],"class_list":["post-214","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aprc","type-construction-logistic","type-construction-offices"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction\" \/>\n<meta property=\"og:description\" content=\"A major player in the development of E. Leclerc&#8217;s market share, La Scalandes is implementing its master plan in the South-West of France. Leclerc, the La Scalandes purchasing center in the South-West of France is implementing its master plan to adapt its logistics infrastructures to its growth. APRC supported the company in this process, delivering [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/\" \/>\n<meta property=\"og:site_name\" content=\"APRC Ing\u00e9nierie et construction\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-18T10:26:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-02T08:57:25+00:00\" \/>\n<meta name=\"author\" content=\"Valerio Motta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Valerio Motta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/\"},\"author\":{\"name\":\"Valerio Motta\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#\\\/schema\\\/person\\\/9f65a3ae75e47abf25d6a6f499ac815c\"},\"headline\":\"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy\",\"datePublished\":\"2024-06-18T10:26:00+00:00\",\"dateModified\":\"2025-10-02T08:57:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/\"},\"wordCount\":607,\"publisher\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/Capture-decran-2024-10-28-a-14.32.16.avif\",\"articleSection\":[\"APRC\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/\",\"url\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/\",\"name\":\"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/Capture-decran-2024-10-28-a-14.32.16.avif\",\"datePublished\":\"2024-06-18T10:26:00+00:00\",\"dateModified\":\"2025-10-02T08:57:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#primaryimage\",\"url\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/Capture-decran-2024-10-28-a-14.32.16.avif\",\"contentUrl\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/Capture-decran-2024-10-28-a-14.32.16.avif\",\"width\":1998,\"height\":816},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"APRC Ing\u00e9nierie &amp; construction\",\"item\":\"https:\\\/\\\/aprc.fr\\\/en\\\/aprc\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/aprc.fr\\\/en\\\/\",\"name\":\"Aprc Ing\u00e9n\u00e9rie et construction\",\"description\":\"Ing\u00e9nierie et construction\",\"publisher\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/aprc.fr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#organization\",\"name\":\"Aprc Ing\u00e9n\u00e9rie et construction\",\"url\":\"https:\\\/\\\/aprc.fr\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/logo-aprc.svg\",\"contentUrl\":\"https:\\\/\\\/aprc.fr\\\/wp-content\\\/uploads\\\/logo-aprc.svg\",\"width\":243,\"height\":99,\"caption\":\"Aprc Ing\u00e9n\u00e9rie et construction\"},\"image\":{\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/aprcgroup\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCfpCVL8zVftEI9lSQ-SHwYw\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/aprc.fr\\\/en\\\/#\\\/schema\\\/person\\\/9f65a3ae75e47abf25d6a6f499ac815c\",\"name\":\"Valerio Motta\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/","og_locale":"en_US","og_type":"article","og_title":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction","og_description":"A major player in the development of E. Leclerc&#8217;s market share, La Scalandes is implementing its master plan in the South-West of France. Leclerc, the La Scalandes purchasing center in the South-West of France is implementing its master plan to adapt its logistics infrastructures to its growth. APRC supported the company in this process, delivering [&hellip;]","og_url":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/","og_site_name":"APRC Ing\u00e9nierie et construction","article_published_time":"2024-06-18T10:26:00+00:00","article_modified_time":"2025-10-02T08:57:25+00:00","author":"Valerio Motta","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Valerio Motta","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#article","isPartOf":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/"},"author":{"name":"Valerio Motta","@id":"https:\/\/aprc.fr\/en\/#\/schema\/person\/9f65a3ae75e47abf25d6a6f499ac815c"},"headline":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy","datePublished":"2024-06-18T10:26:00+00:00","dateModified":"2025-10-02T08:57:25+00:00","mainEntityOfPage":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/"},"wordCount":607,"publisher":{"@id":"https:\/\/aprc.fr\/en\/#organization"},"image":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#primaryimage"},"thumbnailUrl":"https:\/\/aprc.fr\/wp-content\/uploads\/Capture-decran-2024-10-28-a-14.32.16.avif","articleSection":["APRC"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/","url":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/","name":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy - APRC Ing\u00e9nierie et construction","isPartOf":{"@id":"https:\/\/aprc.fr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#primaryimage"},"image":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#primaryimage"},"thumbnailUrl":"https:\/\/aprc.fr\/wp-content\/uploads\/Capture-decran-2024-10-28-a-14.32.16.avif","datePublished":"2024-06-18T10:26:00+00:00","dateModified":"2025-10-02T08:57:25+00:00","breadcrumb":{"@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#primaryimage","url":"https:\/\/aprc.fr\/wp-content\/uploads\/Capture-decran-2024-10-28-a-14.32.16.avif","contentUrl":"https:\/\/aprc.fr\/wp-content\/uploads\/Capture-decran-2024-10-28-a-14.32.16.avif","width":1998,"height":816},{"@type":"BreadcrumbList","@id":"https:\/\/aprc.fr\/en\/la-scalandes-e-leclerc-optimize-its-logistics-strategy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"APRC Ing\u00e9nierie &amp; construction","item":"https:\/\/aprc.fr\/en\/aprc\/"},{"@type":"ListItem","position":2,"name":"APRC (Aprc Group) helps LA Scalandes (E.Leclerc) optimize its logistics strategy"}]},{"@type":"WebSite","@id":"https:\/\/aprc.fr\/en\/#website","url":"https:\/\/aprc.fr\/en\/","name":"Aprc Ing\u00e9n\u00e9rie et construction","description":"Ing\u00e9nierie et construction","publisher":{"@id":"https:\/\/aprc.fr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aprc.fr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aprc.fr\/en\/#organization","name":"Aprc Ing\u00e9n\u00e9rie et construction","url":"https:\/\/aprc.fr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aprc.fr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/aprc.fr\/wp-content\/uploads\/logo-aprc.svg","contentUrl":"https:\/\/aprc.fr\/wp-content\/uploads\/logo-aprc.svg","width":243,"height":99,"caption":"Aprc Ing\u00e9n\u00e9rie et construction"},"image":{"@id":"https:\/\/aprc.fr\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/aprcgroup\/","https:\/\/www.youtube.com\/channel\/UCfpCVL8zVftEI9lSQ-SHwYw"]},{"@type":"Person","@id":"https:\/\/aprc.fr\/en\/#\/schema\/person\/9f65a3ae75e47abf25d6a6f499ac815c","name":"Valerio Motta"}]}},"_links":{"self":[{"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/posts\/214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/comments?post=214"}],"version-history":[{"count":4,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/posts\/214\/revisions"}],"predecessor-version":[{"id":2986,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/posts\/214\/revisions\/2986"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/media\/2983"}],"wp:attachment":[{"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/media?parent=214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/categories?post=214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/tags?post=214"},{"taxonomy":"type-construction","embeddable":true,"href":"https:\/\/aprc.fr\/en\/wp-json\/wp\/v2\/type-construction?post=214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}